Welcome to our project news hub! Here, you’ll find updates on our project implementation and realization efforts. Stay tuned for the latest developments, milestones, working packages and successes as we bring our project toward goals.
-

DEMONITOR Project Enhances Research with Advanced Geophysical System MAE X612EM
As part of the DEMONITOR Project, we have acquired a high-performance geophysical system, MAE X612EM, to enhance our research and field investigations. This acquisition is a crucial step in achieving the project’s goal of integrating advanced geophysical techniques for improved landscape monitoring and conservation. The MAE X612EM is a geoelectrical resistivity and induced polarization (IP)
-

DEMONITOR Team Presents Research at STEPGRAD 2024 Conference
The DEMONITOR project team recently participated in the 14th International Conference on Contemporary Theory and Practice in Construction (STEPGRAD 2024), held in Banja Luka, Bosnia and Herzegovina, from June 13 to 14, 2024. This regional conference covered topics in architecture, urban planning, civil engineering, geodesy, and related scientific disciplines, with a particular focus on engineering
-

Successful Installation of OVS Camera During Field Visit
As part of the ongoing efforts within Work Package 2 (Acquisition), a field visit was conducted to advance the project’s planned investigations. This visit served as an extension of the initial trip undertaken in February 2024. During the previous visit, the procurement of the OVS camera, intended for installation, could not be completed, and not
